Genoa Township Equalizes SBR Inflow for Lake Edgewood
Check out this project report highlighting Kennedy’s creative problem solving.
Kennedy’s solution solved a long-standing issue at the Lake Edgewood Wastewater Treatment Plant which is already lowering their operation costs.